Our Projects
Our Projects
A record of the infrastructure and supply work INSCOA Holdings has delivered for government agencies, state institutions and international main contractors across Sri Lanka.

EmployerAirport & Aviation Sri Lanka

Bandaranaike International Airport Development Project (Phase II, Stage 2)

Temporary relocation of utility pipe works — fire hydrant, water supply and sewerage water transfer pipe — for Package A, the Passenger Terminal Building and associated works.

EmployerNational Water Supply & Drainage Board

Integrated Water Supply Project — Aluthgama, Mathugama & Agalawatta

Electro-mechanical installation of three 750kW pumps with VFD control, water treatment equipment, HV substation, SCADA, plus 45km of DI pipe laying for raw water main and transmission.

EmployerMinistry of Health

District General Hospital, Hambantota — Water Sumps & Booster Pumping System

Construction of two water sumps and supply/installation of booster pumps, control panels and pipe fittings.

ClientChina State Construction Engineering Corporation Ltd.

Upper Elahera Canal Project — Steel Fabrication Supply

Supply of fabricated steel bars for the Upper Elahera Canal Project.

ClientNational Water Supply & Drainage Board / CML MTD

Diyathalawa Water Supply Scheme — Pump & Air Blower Supply

Supply of two 55kW split casing back-wash pumps and air blowers, plus pressure sand filter equipment.

ClientCeylon Electricity Board

Kelanitissa Power Station — Finned Tube Procurement

Import, supply and delivery of 7,200mm Carbon Steel ASME SA 179 seamless tubes with "L"-type aluminium fins, 440 units, replacing corroded finned tubes on the Fr V Gas Turbine 01.

Have a Project of This Scale?

Our engineering and supply teams are ready to bring the same rigour to your next project.

Call +94 77 235 7071